Ballesteros-Pérez, P, Skitmore, M, Sanz-Ablanedo, E and Verhoeven, P (2019) Forecasting the Number and Distribution of New Bidders for an Upcoming Construction Auction. Journal of Construction Engineering and Management, 145(10).

Bingham, E, Gibson, G E and El Asmar, M (2019) Identifying Team Selection and Alignment Factors by Delivery Method for Transportation Projects. Journal of Construction Engineering and Management, 145(10).

Eke, G, Elgy, J and Wedawatta, G (2019) Establishing a Link between Contractor Selection Strategy and Project Outcomes: Simulation Study. Journal of Construction Engineering and Management, 145(10).

El-adaway, I H, Ali, G, Assaad, R, Elsayegh, A and Abotaleb, I S (2019) Analytic Overview of Citation Metrics in the Civil Engineering Domain with Focus on Construction Engineering and Management Specialty Area and Its Subdisciplines. Journal of Construction Engineering and Management, 145(10).

Ioannou, P G (2019) Friedman’s Bidding Model: Errors and Corrections. Journal of Construction Engineering and Management, 145(10).

Khalafallah, A, Kartam, N and Razeq, R A (2019) Bilevel Standards-Compliant Platform for Evaluating Building Contractor Safety. Journal of Construction Engineering and Management, 145(10).

Lagos, C I, Herrera, R F and Alarcón, L F (2019) Assessing the Impacts of an IT LPS Support System on Schedule Accomplishment in Construction Projects. Journal of Construction Engineering and Management, 145(10).

  • Type: Journal Article
  • Keywords: Last Planner System; Information technologies; Implementation level; Project performance; Schedule accomplishment;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001691
  • Abstract:
    This paper seeks to identify improvements in the level of implementation of the Last Planner System (LPS) with the use of information technologies (IT) based on its methodology. In addition, we correlate the level of implementation of specific LPS components to the plan percent complete (PPC). The conjoint analysis of IT benefits in implementation and correlation to PPC allowed identification of two critical components: the standardization of the planning and control process, which can be quantitatively assessed by the PPC, and the systematic analysis and removal of constraints assessed through the percentage of constraints removed (PCR). A sample of 50 projects was used to corroborate that projects that have higher PPC and PCR also have better performance, measured by the schedule accomplishment and number of noncompliances. Consequently, results inferred that projects that use IT systems based on LPS have a more systematic planning and control and better constraint management that also correspond to better schedule accomplishment and less noncompliance.

Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of Project Delivery Systems in Executing Green Buildings. Journal of Construction Engineering and Management, 145(10).

Tetteh, M O and Chan, A P C (2019) Review of Concepts and Trends in International Construction Joint Ventures Research. Journal of Construction Engineering and Management, 145(10).

Wang, C, Loo, S C, Yap, J B H and Abdul-Rahman, H (2019) Novel Capability-Based Risk Assessment Calculator for Construction Contractors Venturing Overseas. Journal of Construction Engineering and Management, 145(10).